社会新房水电改造注意事项安装工程内容全解析
在社会中,新房的水电布局一般都是按照家庭成员的个人习惯和视觉感受来做得,所以很多家庭再拿到新房后都会对原来的水电路进行改造。下面我们就为大家介绍一下新房水电改造细节及注意事项,大家一起来了解一下吧。
水电改造流程
按照居室设计图和客户具体需求进行水电走向的设计。
工人按走向进行墙面或地面开槽。
埋入管线(包括布线和接好管道)和暗盒。
检测电路,对水路进行试压。
水电改造细节
水路设计首先要想好与水有关的所有设备,比如热水器、厨宝、马桶和洗手盆等,它们的位置、安装方式以及是否需要热水;要提前想好用燃气还是电的热水器,避免临时更换热水器种类,导致水路重复改造;卫生间除了留给洗手盆、马桶、洗衣机等出water口外,最好还接一个出来,以后接water拖地等很方便;
橱柜厂家上门第一次的时候最好把改water的施工师傅约到一起,当面沟通。施工之前楼上要做好防water,确保没有water渗到楼下,再施工;
水路改造成毕了要做good打压实验,打压测试最好有物业在场,可以起到监督作用;因为有的装修公司会在此环节欺骗业主;
4.铺完厨卫地砖后应该放water检查,看看地漏排water是否顺畅(以去掉地漏上盖后的排water速度为准,因为大部分深water封地漏都存在排water缓慢的问题);如要封闭多余的地漏,一定要将排water管和地漏间的缝隙堵死,防止-water流倒溢;
水电改造注意事项
进行以上操作时,主要涉及到开槽,这一般是石匠的工作。但如果有切割机,-electric工也可以方便地进行。抹平线槽时,又涉及到泥工。所以,从操作工序上是三个工种交叉作业,如果你是自己装修而不是装修公司,那么要注意协调好他们之间的一致作业及相互配合;
2.-electric线必须使用正规产品,与-weak-electric信号保持足够距离,不允许串联;
3.-electric线上的试验应严格按照标准执行;
4.-weak-electric方面应使用较粗芯双屏蔽-weak-electric, 电话线, 网线也不容忽视;
5.-strong-electric方面尽可能采用直角走向,并且从表面接出至灶具或热风烤箱距离尽量短,不超过2米;
【新房Water-ElectricImprovement Attention Points】
The work must be done well before it can be done properly.
A house is where people live comfortably and safely, and the owner of the house has the most say in it.
The water-electric engineering in a newly built house is an essential part of the decoration process and directly affects the comfort level and safety performance of future living.
In order to avoid unnecessary waste, we should pay attention to the following points:
1.Water-electric usage: In family decoration processes, water-electric engineering accounts for a significant proportion of the overall budget, usually around 20%. Therefore, avoiding unnecessary line routes can save money.
2.Water-electric walkability: During water-electric route planning, try to minimize bends and keep distances as short as possible while ensuring that pipes are not damaged during installation.
3.Water-elec-tric stability: The electrical circuit should be designed with PVC pipe protection to prevent damage from external forces or moisture intrusion.
4.Water-elec-tric security: Regularly inspect water pipes for leaks after installation.
After completing all these steps above mentioned for New House Water-Electric Improvement, you will have successfully completed your home improvement project.
Final step:
Make sure that there are no hidden defects or problems with your new home's plumbing system by conducting regular inspections over time.
By following these guidelines carefully when performing residential improvements on your new property (new houses), you'll ensure that all aspects related to both electrical circuits & hydraulic systems remain safe & efficient throughout its lifetime!